Installed in under 4 hours.
Your choice how.
Choose professional installation by our own team, or self-install with our full video series and printed manual. Both options get your pod running the same day.
What happens on installation day
Our team handles everything from the moment we arrive. Here's exactly what to expect.
We confirm access
Before delivery, we'll confirm door widths, lift dimensions and floor access so there are no surprises.
Delivery arrives
Pods are delivered flat-packed. Our team manages unloading and moving panels to your floor — no effort required from you.
Assembly on site
We assemble the pod in your chosen location. Professional installation takes under four hours for any model.
Power connected
We connect to a standard 240V wall outlet — no electrician needed. Ventilation, lighting and power are tested before we leave.
Ready to use
We clean up, remove all packaging and debris, and hand over a fully operational pod. Your team can walk in and start working immediately.
Everything you need to
install your own FocusPod.
Included with every pod — no extra cost, no request needed. Both the video link and printed manual are sent automatically with your order confirmation. Assembly takes 3–8 hours depending on model, and is designed for two people with standard tools.
Video installation series
A complete chapter-by-chapter video walkthrough covering every step of assembly. Filmed on actual FocusPod models so you can follow along in real time. Access is provided after purchase.
Printed installation manual
A full printed manual ships inside the box with every pod — no printing required. Covers assembly sequence, panel fitting, power connection and troubleshooting.
Video chapter guide — FocusPod Solo™
Video series access is provided after purchase via email. Chapter guides available for all 6 models — Solo, Solo Plus, Duo, Team, Meet and Max.
Access requirements
We confirm these details before every delivery to make sure everything runs smoothly on the day.
Door width
All FocusPod panels are designed to pass through standard commercial doorways. We'll confirm your access points before scheduling delivery.
Min. 800mm clear widthLift access
If your floor requires lift access, we'll confirm cabin dimensions to ensure panels can be transported. Most commercial lifts are suitable.
Min. 1.0m × 1.2m cabinFloor loading
FocusPod pods are designed for standard commercial floor loading. We'll confirm your floor specification for larger multi-pod installations.
Standard commercial floors suitablePower outlet
Each pod requires a single standard 240V wall outlet within 2m of the installation location. No dedicated circuit or electrician needed.
Standard 240V GPOLoading dock
For multi-pod orders, loading dock access is preferred but not essential. We'll discuss delivery logistics with you during the pre-installation call.
Preferred for 3+ podsParking / unloading
We'll need short-term unloading access at street level or basement entry. Most buildings can accommodate this with advance notice to building management.
30–60 min unloading windowInstallation FAQs
Everything you need to know before your pod arrives.
FocusPod Solo™
FocusPod Solo Plus™
FocusPod Duo™
FocusPod Team™
FocusPod Meet™
FocusPod Max™